002 -- Cost index of civil engineering works 2015=100, indices according to input items
Select part:
Download:
View table:
Size:
39655
Modified:
10/23/2018
- Year: 2015, 2016, 2017, 2018, (4)
- Month: January, February, March, April, ..., Annual average (13)
- Type: 11 Foundation structures, 12 Earth structures, 13 Rock structures, 14 Surfacing, ..., 20-22 Maintenance total (13)
- Input item: Total index, 1 Labour, 2 Own machinery, 3 Purchased machine services, ..., 6 Construction site overhead costs (7)
- Data: Point figure, (1)