To the Top
The database change of 8 June 2026 requires updates to API queries (e.g. shortening of identifiers and variable codes), no changes to user interface use. Further instructions and examples of changes.
The 3 steps are Choose table, Choose variable and Show result. You are currently at Show result

Result

Tools

Statistics Finland
Yes
1/23/2026
Cost index of civil engineering works (2015=100) point figure:
index point
2/23/2026
9/19/2018
Statistics Finland, cost index of civil engineering works
119q
Viewing options for result.

















Available format for downloading data.


















What do you want to do with your saved query if the tables are updated with new time periods?

Which rows are to be displayed?



Cost index of civil engineering works index (2015=100), tolal index by cost factor, annual data by Year, Cost factor and Information

UserManualScreenReader_Result_Text
Cost index of civil engineering works index (2015=100), tolal index by cost factor, annual data by Year, Cost factor and Information
 Cost index of civil engineering works (2015=100) point figure
2025 
Total index130.6
1 Labour118.0
11 Wages..
Documentation of statistics

Cost factor

Cost factors are the commodities or commodity groups of input items.

Information

Cost index of civil engineering works (2015=100) point figure

Point figure is a change quantity used in price indices, which expresses the price, average price or index of the comparison period relative to the price, average price or index of the base period. The point figure of the base period is usually denoted by the number hundred. For example, if the point figure for a commodity at a certain point in time is 105.3, it means that the price of that commodity has risen by 5.3 per cent from the base period.
POST the following JSON query to the URL below to access this table from your application.