13x6 -- Cost index of civil engineering works (2020=100), total index by cost factor, monthly data, 2020M01-2025M05

Choose variables

Statistics Finland
Yes
6/25/2025
Cost index of civil engineering works (2020=100) point figure:
Index point
Cost index of civil engineering works (2020=100) annual change, %:
%
Cost index of civil engineering works (2020=100) monthly change, %:
%
7/23/2025
2/14/2023
Statistics Finland, cost index of civil engineering works
001_13x6_2025m05
Now you have come to the page, Choose variable. This page give you the oportunity to select which variables and values you want to display in your result of the table. A variable is a property of a statistical unit. The page is divided into several boxes, one for each variable, where you can select values by click to highlight one or more values. It always starts with the statistics variable which is the main value counted in the table.
Mandatory

Selected 1 of total 3

Mandatory
Field for searching for a specific value in the list box. This is examples of values you can search for.2020M01 , 2020M02 , 2020M03 ,

Selected 1 of total 65

Mandatory
Field for searching for a specific value in the list box. This is examples of values you can search for.Total index , 1 Labour , 11 Wages ,

Selected 0 of total 25

Number of selected data cells are:
(maximum number allowed is 300,000)

Presentation on screen is limited to 1,000 rows and 30 columns

Number of selected cells exceeds the maximum allowed 300,000

Obs:

Corrected 25.6.2025. The average interest rate of new business loans published by the Bank of Finland is used for interest rate monitoring. The average interest rate used to produce the cost index of civil engineering works for March was erroneous. As a result of the correction, the annual change in the total index for March 2025 was revised upwards by 0.4 percentage points (was -0.1%). The correction has an effect on the following cost factors of the total index: own machinery, interests and insurances. The correction also had an effect on the monthly changes in April 2025.
Documentation of statistics

Cost factor

Cost factors are the commodities or commodity groups of input items.

Information

Cost index of civil engineering works (2020=100) point figure

Point figure is a change quantity used in price indices, which expresses the price, average price or index of the comparison period relative to the price, average price or index of the base period. The point figure of the base period is usually denoted by the number hundred. For example, if the point figure for a commodity at a certain point in time is 105.3, it means that the price of that commodity has risen by 5.3 per cent from the base period.

Cost index of civil engineering works (2020=100) annual change, %

Cost index of civil engineering works point figures annual change %.

Cost index of civil engineering works (2020=100) monthly change, %

Cost index of civil engineering works (2020=100) monthly change, %